Etruscan's initial exploration efforts in West Africa in the mid-1990's were focused on the 50 kilometer Samira gold belt of Niger which today hosts Etruscan's first producing property, the Samira Hill Gold Mine.

Samira Hill Gold Mine


The Mine


President Gerry McConnell with Hakim Ouazzani (Project Manager) and Ahmed Elarouri (Mine Manager), holding first Samira Hill Gold Bar.

Samira - Etruscan's First Gold Mine
The Samira Hill Gold Mine is the first commercial open pit gold mine in Niger and began operation in September 2004. The pre-production mineable reserves from the Samira Hill and Libiri pits are estimated to total 10.08 million tonnes grading 2.2 grams of gold per tonne from which 618,000 ounces will be recovered over a 6.3 year mine life.

The current mining operation is only processing the near-surface oxide and transition ores from the Samira and Libiri deposits and does not account for the possibility of mining the deeper sulphide ores or additional ores from satellite deposits along the 50 kilometer strike length of the Samira Gold Belt.

Location

The Samira Hill Gold Project encompasses the Samira Hill gold deposit discovered on the Tiawa exploration permit and the Libiri gold deposit (three kilometers from Samira Hill) discovered on the Saoura exploration permit. The Samira Hill Gold Project is located approximately 90 kilometers west of Niamey, the capital city of Niger on the 50 kilometer gold belt commonly referred to as the Samira Horizon. The south-western corner of the property is contiguous with the border of Burkina Faso.

Ownership

The Samira Hill Gold Project is operated under the Nigerien company, Société des Mines du Liptako (SML) S.A. ("SML"). SML is owned 80% by African GeoMin Mining Development Corporation Limited ("AGMDC") and 20% by the State of Niger. AGMDC is in turn owned by Etruscan (50%) and Semafo Inc. (50%). Semafo Inc. is the operator of the Samira Hill Gold Mine.

Production

The first gold ingot from the Samira Hill Gold Mine was poured on September 25, 2004 and commercial production at the Samira Hill Gold Mine commenced on October 1, 2004.

Production Statistics Year ended
Nov 30, 2004
Year ended
Nov 30, 2005
Year ended
Nov 30, 2006
Year ended
Nov 30, 2007
Operating Statistics
Gold sales (ounces) 12,143 95,753 N/A N/A
Gold production (ounces) 18,022 92,270 51,713 76,399
Plant throughput (tonnes) 344,489 1,337,195 911,485 1,433,657
Head-grade (g/t) 2.10 2.36 2.22 1.97
Recovery (%) 89 88 81 84
Cash operating cost (US$/ounce) 210 247 N/A N/A

Forecast production for calendar year 2008 is 70,000 ounces.


click to view enlarged

Samira Gold Belt (see map right)

The Samira Hill and Libiri deposits are just two of a number of significant gold deposits along the 50 kilometer Samira Gold Belt extending into neighbouring Burkina Faso. By constructing a central processing facility at Samira, Etruscan expects to extend the 6.3 year mine life with the development of existing satellite deposits and the discovery of new deposits within easy trucking distance of the existing mill.

^Top


Maps and Photos

--
:Show image 'ROM Pad at Samira' in New Window:
--
ROM Pad at Samira
50 KB, approx. 10 seconds at 56.6Kbps
--
:Show image 'Samira Plant Site' in New Window:
--
Samira Plant Site
41 KB, approx. 9 seconds at 56.6Kbps
--
:Show image 'Mining Ore at Samira' in New Window:
--
Mining Ore at Samira
63 KB, approx. 13 seconds at 56.6Kbps
--
:Show image 'Samira Hill Gold Project CIL Plant' in New Window:
--
Samira Hill Gold Project CIL Plant
15 KB, approx. 4 seconds at 56.6Kbps
--
:Show image 'Jaw and ore delivery system to mill' in New Window:
--
Jaw and ore delivery system to mill
16 KB, approx. 4 seconds at 56.6Kbps
--
:Show image 'Ore on conveyor from jaw crusher to plant' in New Window:
--
Ore on conveyor from jaw crusher to plant
11 KB, approx. 3 seconds at 56.6Kbps
--
:Show image 'First bench of the open pit' in New Window:
--
First bench of the open pit
22 KB, approx. 5 seconds at 56.6Kbps
--
:Show image 'Retaining wall and crushing' in New Window:
--
Retaining wall and crushing
23 KB, approx. 5 seconds at 56.6Kbps
--
:Show image 'Sag mill in place' in New Window:
--
Sag mill in place
24 KB, approx. 6 seconds at 56.6Kbps
--
:Show image 'Three of six generators (1000 kw units)' in New Window:
--
Three of six generators (1000 kw units)
13 KB, approx. 3 seconds at 56.6Kbps
--
:Show image 'Six 1400 cubic meter CIL tanks and mill' in New Window:
--
Six 1400 cubic meter CIL tanks and mill
19 KB, approx. 4 seconds at 56.6Kbps
--
:Show image 'Cyclones' in New Window:
--
Cyclones
14 KB, approx. 4 seconds at 56.6Kbps
--
:Show image 'Eluate storage tank' in New Window:
--
Eluate storage tank
17 KB, approx. 4 seconds at 56.6Kbps
--
:Show image 'Electrowinning cell' in New Window:
--
Electrowinning cell
13 KB, approx. 3 seconds at 56.6Kbps
--
:Show image 'Carbon regen furnace' in New Window:
--
Carbon regen furnace
15 KB, approx. 4 seconds at 56.6Kbps
--
:Show image 'First pour from Samira Hill.  13.5 kg' in New Window:
--
First pour from Samira Hill. 13.5 kg
15 KB, approx. 4 seconds at 56.6Kbps
 